  {"id":18093,"date":"2016-11-18T14:22:11","date_gmt":"2016-11-18T19:22:11","guid":{"rendered":"https:\/\/digital.hbs.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/"},"modified":"2016-11-18T14:25:46","modified_gmt":"2016-11-18T19:25:46","slug":"disrupting-the-construction-industry-through-the-use-of-digitization","status":"publish","type":"hck-submission","link":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/","title":{"rendered":"Disrupting the Construction Industry Through the Use of Digitization"},"content":{"rendered":"<p>Construction as an industry is vital for the progress of society. Not only does it account for 6% of global GDP (even 8% in emerging economies) but also it plays a key role in narrowing the infrastructure gap and enhancing economic development(1). Currently, the population of the world\u2019s urban areas is increasing at a rate of 200,000 people per day and they all require access to affordable housing and essential public service infrastructure such as hospitals, schools, water and energy utilities and transportation(2). In fact, $57 trillion must be invested in infrastructure by 2030 just to keep up with economic growth(3).<\/p>\n<p>Despite of the enormous challenges facing the industry, it has undergone little change in the last few decades; its productivity levels have remained stagnant and its profit margins low. For instance, overall labor productivity in Germany and the UK has increased by 30% since 1995 while labor productivity in the construction industry has increased only by 7% during that same period(4).<\/p>\n<p><strong>Exhibit 1 \u2013 Labor productivity (gross value added per hour worked) in Germany and UK.<\/strong><\/p>\n<p><a href=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-18043\" src=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1-300x158.png\" alt=\"uk-and-germany-construction-productivity\" width=\"564\" height=\"297\" srcset=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1-300x158.png 300w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1-768x405.png 768w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1-1024x541.png 1024w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1-600x317.png 600w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/UK-and-Germany-Construction-Productivity-1.png 1038w\" sizes=\"auto, (max-width: 564px) 100vw, 564px\" \/><\/a><\/p>\n<p>There are several intrinsic challenges to the construction industry that restrain improvements in efficiency and profitability:<\/p>\n<ol>\n<li>The value chains are heavily fragmented,<\/li>\n<li>The transfer of knowledge between projects is limited because each project is unique,<\/li>\n<li>Projects are getting more complex; increasing number of megaprojects (&gt;$1 billion)(5).<\/li>\n<\/ol>\n<p>These challenges have limited the introduction of digitization and innovative technologies, which in turn have resulted in marginal productivity improvements as compared to those in other industries. Nonetheless, a San Francisco based startup (Rhumbix) has come up with a solution to one of the most relevant sources of inefficiency in the industry: labor management.<\/p>\n<p>Labor costs in the construction industry account for a high percentage of the overall budget and yet they are extremely difficult to forecast and manage because they vary widely and the data available is generally inaccurate(6). Rhumbix is based around the need for accurate data in real-time. Data is captured through smartphones held by On-site workers. This data feeds a software platform that runs analytics and produces a series of interactive daily reports. Managers and engineers can use these reports to get insights on the workforce interaction patterns, site layout optimization and labor distribution(7).<\/p>\n<p><strong>Exhibit 2 \u2013 Sample of Rhumbix interface for site layout<\/strong><\/p>\n<p><a href=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Site-interface.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-18007\" src=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Site-interface-300x196.png\" alt=\"site-interface\" width=\"565\" height=\"369\" srcset=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Site-interface-300x196.png 300w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Site-interface-768x502.png 768w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Site-interface-600x392.png 600w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Site-interface.png 1019w\" sizes=\"auto, (max-width: 565px) 100vw, 565px\" \/><\/a><\/p>\n<p>Currently, on-site data collection is done by the foreman who manually fills in daily time cards with information about his crew and their specific daily activities. A lot of inaccuracy is introduced at this stage not only because of human error but also because work activities tend to change during the workday and don\u2019t get recorded. Moreover, managers usually get the information one week later which limits their ability to influence performance because by the time they get last week\u2019s information, the set of work activities carried out on-site have changed.<\/p>\n<p>Rhumbix replaces the traditional paper-based time card with digital records that are fed by the GPS device in every worker\u2019s smartphone. This increases the reliability of the information and the information is available to every engineer and manager in real-time. This gives way to infinite opportunities as managers can track the performance of each crew or worker, identify sources of productivity losses and immidiately take action to solve the problem.<\/p>\n<p><strong>Exhibit 3 \u2013 Sample of Rhumbix interface for worker location<\/strong><\/p>\n<p><a href=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/worker-location-interface.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-18009\" src=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/worker-location-interface-300x186.png\" alt=\"worker-location-interface\" width=\"410\" height=\"254\" srcset=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/worker-location-interface-300x186.png 300w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/worker-location-interface-600x371.png 600w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/worker-location-interface.png 750w\" sizes=\"auto, (max-width: 410px) 100vw, 410px\" \/><\/a><\/p>\n<p>Additionally, managers struggle to have a consolidated version of the on-site information on time. In consequence, they end up using historical ratios from past similar projects to forecast labor, equipment and materials needs. This practice results in huge differences between the budget and actual costs and, therefore, the project\u2019s cash flow is impacted. Rhumbix provides managers with the actual production rates and uses them to forecast costs and completion dates, resulting in more precise forecasts.<\/p>\n<p><strong>Exhibit 4 \u2013 Sample of Rhumbix interface for daily profitability report<\/strong><\/p>\n<p><a href=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-18006\" src=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report-300x188.png\" alt=\"daily-profit-report\" width=\"554\" height=\"347\" srcset=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report-300x188.png 300w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report-768x482.png 768w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report-1024x643.png 1024w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report-600x377.png 600w, https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/daily-profit-report.png 1429w\" sizes=\"auto, (max-width: 554px) 100vw, 554px\" \/><\/a><\/p>\n<p>However, there is much room for improvement. First, it is an expensive solution because it requires that each worker is given a smartphone. The use of small GPS trackers could fulfill the same purpose at a fraction of the cost. Another improvement is that for now the solution is only applicable to the workforce. It could also be applied to equipment and inventory so that managers could have a holistic management tool for the construction site.<\/p>\n<p>(Word Count 800)<\/p>\n<p>&nbsp;<\/p>\n<p>[1] The World Economic Forum Industry Agenda, \u201cShaping the Future of Construction\u201d, WEF, May 2016.<\/p>\n<p>[2] The World Economic Forum Industry Agenda, \u201cShaping the Future of Construction\u201d, WEF, May 2016.<\/p>\n<p>[3] Blanco, Jose Luis, Mauricio Janauskas, and Maria Joao Ribeirinho, \u201cBeating the low-productivity trap: How to transform construction operations\u201d, McKinsey &amp; Company, July 2016.<\/p>\n<p>[4] Blanco, Jose Luis, Mauricio Janauskas, and Maria Joao Ribeirinho, \u201cBeating the low-productivity trap: How to transform construction operations\u201d, McKinsey &amp; Company, July 2016.<\/p>\n<p>[5] Blanco, Jose Luis, Mauricio Janauskas, and Maria Joao Ribeirinho, \u201cBeating the low-productivity trap: How to transform construction operations\u201d, McKinsey &amp; Company, July 2016.<\/p>\n<p>[6] Said, Carolyn, \u201cRhumbix uses data, app to boost efficiency at construction sites\u201d, San Francisco Chronicle, November 10, 2015.<\/p>\n<p>[7] \u201cContinuously Improve Project Performance\u201d, Rhumbix official site, <a href=\"https:\/\/www.rhumbix.com\/solution\/\">https:\/\/www.rhumbix.com\/solution\/<\/a>, Accesed November 2016.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction has traditionally lagged behind other industries in terms of productivity rates because the variable nature of the work limits the standardization of tasks and the introduction of innovative technologies. However, the access to more reliable real-time data may change that in the near future. <\/p>\n","protected":false},"author":2232,"featured_media":18094,"comment_status":"open","ping_status":"closed","template":"","categories":[428,788,2270,1077,995],"class_list":["post-18093","hck-submission","type-hck-submission","status-publish","has-post-thumbnail","hentry","category-construction","category-digital","category-digital-disruption","category-labor","category-productivity-improvement"],"connected_submission_link":"https:\/\/d3.harvard.edu\/platform-rctom\/assignment\/digitization-challenge-2016\/","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Disrupting the Construction Industry Through the Use of Digitization - Technology and Operations Management<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Disrupting the Construction Industry Through the Use of Digitization - Technology and Operations Management\" \/>\n<meta property=\"og:description\" content=\"Construction has traditionally lagged behind other industries in terms of productivity rates because the variable nature of the work limits the standardization of tasks and the introduction of innovative technologies. However, the access to more reliable real-time data may change that in the near future.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/\" \/>\n<meta property=\"og:site_name\" content=\"Technology and Operations Management\" \/>\n<meta property=\"article:modified_time\" content=\"2016-11-18T19:25:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Bridge-construction-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1231\" \/>\n\t<meta property=\"og:image:height\" content=\"612\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/\",\"url\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/\",\"name\":\"Disrupting the Construction Industry Through the Use of Digitization - Technology and Operations Management\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2016\\\/11\\\/Bridge-construction-image.jpg\",\"datePublished\":\"2016-11-18T19:22:11+00:00\",\"dateModified\":\"2016-11-18T19:25:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/#primaryimage\",\"url\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2016\\\/11\\\/Bridge-construction-image.jpg\",\"contentUrl\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2016\\\/11\\\/Bridge-construction-image.jpg\",\"width\":1231,\"height\":612},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/disrupting-the-construction-industry-through-the-use-of-digitization\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Submissions\",\"item\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/submission\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Disrupting the Construction Industry Through the Use of Digitization\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/#website\",\"url\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/\",\"name\":\"Technology and Operations Management\",\"description\":\"MBA Student Perspectives\",\"potentialAction\":[{\"@type\":\"性视界Action\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/d3.harvard.edu\\\/platform-rctom\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Disrupting the Construction Industry Through the Use of Digitization - Technology and Operations Management","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/","og_locale":"en_US","og_type":"article","og_title":"Disrupting the Construction Industry Through the Use of Digitization - Technology and Operations Management","og_description":"Construction has traditionally lagged behind other industries in terms of productivity rates because the variable nature of the work limits the standardization of tasks and the introduction of innovative technologies. However, the access to more reliable real-time data may change that in the near future.","og_url":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/","og_site_name":"Technology and Operations Management","article_modified_time":"2016-11-18T19:25:46+00:00","og_image":[{"width":1231,"height":612,"url":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Bridge-construction-image.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/","url":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/","name":"Disrupting the Construction Industry Through the Use of Digitization - Technology and Operations Management","isPartOf":{"@id":"https:\/\/d3.harvard.edu\/platform-rctom\/#website"},"primaryImageOfPage":{"@id":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/#primaryimage"},"image":{"@id":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/#primaryimage"},"thumbnailUrl":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Bridge-construction-image.jpg","datePublished":"2016-11-18T19:22:11+00:00","dateModified":"2016-11-18T19:25:46+00:00","breadcrumb":{"@id":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/#primaryimage","url":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Bridge-construction-image.jpg","contentUrl":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-content\/uploads\/sites\/4\/2016\/11\/Bridge-construction-image.jpg","width":1231,"height":612},{"@type":"BreadcrumbList","@id":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/disrupting-the-construction-industry-through-the-use-of-digitization\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/d3.harvard.edu\/platform-rctom\/"},{"@type":"ListItem","position":2,"name":"Submissions","item":"https:\/\/d3.harvard.edu\/platform-rctom\/submission\/"},{"@type":"ListItem","position":3,"name":"Disrupting the Construction Industry Through the Use of Digitization"}]},{"@type":"WebSite","@id":"https:\/\/d3.harvard.edu\/platform-rctom\/#website","url":"https:\/\/d3.harvard.edu\/platform-rctom\/","name":"Technology and Operations Management","description":"MBA Student Perspectives","potentialAction":[{"@type":"性视界Action","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/d3.harvard.edu\/platform-rctom\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/hck-submission\/18093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/hck-submission"}],"about":[{"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/types\/hck-submission"}],"author":[{"embeddable":true,"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/users\/2232"}],"replies":[{"embeddable":true,"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/comments?post=18093"}],"version-history":[{"count":0,"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/hck-submission\/18093\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/media\/18094"}],"wp:attachment":[{"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/media?parent=18093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/d3.harvard.edu\/platform-rctom\/wp-json\/wp\/v2\/categories?post=18093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}